IMPRESA HOMES
Designed for Better Living
Your dream home starts here
Quality & Craftsmanship From the Foundation Up
Our homes are built on a foundation of quality and strength that is designed to last a lifetime.
Offsite construction, completed in an indoor environment, provides an extremely energy-efficient structure at a level of quality that is difficult to match with onsite construction.
- Energy efficient with increased insulation, high-tech sealants, and advanced materials
- Superior engineering
- Quality controlled
- Lean manufacuturing to cut waste & minimize environmental impact
- Precast concrete foundation with insulation
of Greenwood, South Carolina
Built Smarter with Sustainable & Efficient Processes
The home construction process in our factory is carefully engineered to create a sequence of steps that is repeated precisely on every module. Our assembly line method decreases the variability that occurs on a site-built project and increases the speed and efficiency of the build.
We have also adopted lean manufacturing principles as a way to eliminate waste and improve efficiencies. Our lean approach employs greater flexibility and reuse within the factory by utilizing or recycling all building materials and leaving virtually zero waste.
Built Faster with Accelerated Productivity & Delivery
Modular construction can reduce timelines by 30-50 percent or more. This means your home is delivered faster and with better cost management.
Labor productivity with modular has shown an increase of 30% on off-site projects when compared with on-site projects. Ultimately, risk is reduced with off-site construction.
Built Stronger with Unmatched Quality and Precision
Our modular homes are built to state and local building codes and typically exceed these requirements. This includes specific construction and design elements designed to meet the wind and thermal zone needs of the delivery area.
READY. SET. MOVE IN
Impresa Home Under Construction
No need to wait for your home to be built — choose one of our homes currently under construction
CTA Text